Project Information

Title: Copper River Watershed Aquatic Ecosystem Enhancement Project 18180120

Project Year and Number: 2018: 18180120

Other Fiscal Years and Numbers for this Project: None

Principal Investigator (PI): Erika Ammann

Assisting Personnel: None

Research Location:

Restoration Category:

Injured Resources Addressed: Not Specified

Abstract: This project will address a total of 13 culverts identified as restoration priorities and an additional matching 1 culvert will be replaced by project partner ADOT. Of the 13 EVOS funded priority culverts identified, two of the culverts will be removed completely and the remaining eleven will be replaced with AOP or Stream Simulation type designed culverts using an approach that combines geomorphic and hydrologic data to allow for juvenile salmonid passage, sediment transport, and flood conveyance. The culverts will be constructed to withstand a 100 year flood event and with a design life of 50 years. Furthermore, the replaced culverts will reduce maintenance of the Copper River Highway and side roads; maintenance of the culverts will be conducted by the Alaska Department of Transportation & Public Facilities (ADOT/PF).


Proposal: View (3,084 KB)

Reports:
FY22 Q1 Report: View (256 KB)
FY22 Q2 Report: View (346 KB)
FY22 Q3 Report: View (2,247 KB)
FY22 Q4 Report: View (350 KB)
FY23 Q1 Report: View (1,081 KB)
FY23 Q2 Report: View (462 KB)
FY23 Q3 Report: View (353 KB)
FY23 Q4 Report: View (1,152 KB)
FY24 Q1 Report: View (504 KB)
FY24 Q2 Report: View (8,379 KB)
Final Report: Not available. For current status, please contact us.

Publications from this Project: None Available